PDH Engineer     PE PDH
PDH Online

Land Surveying Procedure NY


Quiz Questions

1. _________ are responsible for insuring safe operating procedures by crew members, instructing crew members on safe work practices, enforcing safety policy, and setting a positive example.
Safety officers
Survey Crew Chiefs
Survey Supervisors
Survey advisor
2. While the Department may have a legal right to enter private property, it is important for the surveyor to use courtesy when doing so.
True
False
3. Which of the following is not a safety equipment?
First aid Kit
Fire extinguisher
Compass
Safety vest
4. The __________ of a control point is a value that represents the uncertainty in the coordinates of the control point relative to the coordinates of other directly connected, adjacent control points at the 95-percent confidence level.
local accuracy
network accuracy
overall accuracy
point accuracy
5. __________ also referred to as Stand Alone, Point, or Absolute Positioning. GPS method by which only one receiver is employed, position is determined from satellite observations only. Accuracy of about 30 ft (10 meters). Recreational GPS receivers rely on this method.
Differential positioning
Autonomous Positioning
Carrier phase positioning
Real time positioning
6. New York State Plane Coordinate System (NYSPCS) is made up of 4 zones. Which of the following is not one of them?
West
Central
East
North
7. The GPS processing software will calculate convergence angles and combined factors. Combined factor = ________________ ?
(grid scale factor x ellipsoidal reduction factor)
(grid scale factor + ellipsoidal reduction factor)
(grid scale factor/ellipsoidal reduction factor)
(grid scale factor – ellipsoidal reduction factor)
8. The ____________ responsible for the work shall assure that field procedures are consistent with the NGS specifications for the desired classification. All field work shall be checked for internal accuracy. All documentation shall be checked for completeness, accuracy and format.
Licensed Contractor
Licensed Crew manager
Licensed Land Surveyor
Licensed Field officer
9. What does the following picture depicts?
Land Surveying Procedure NY
NYSDOT Network Control Projects
NYSDOT Survey Control Classifications
NYSDOT Network Control Diagrams
None of the above
10. To qualify for adjustment, level line (differential, trigonometric or GPS) error shall not exceed ___________ where D is the length of the level line in miles.
.03 ft*√D
.03 ft/√D
.05 ft*√D
.03 ft+√D
11. The primary project control is used to establish secondary project control within the project area, to control the engineering and real property acquisition work required for a project.
True
False
12. When the term __________ is used in this NYDOT manual it refers to the ground control targets or photo identifiable points occurring within the area of a project.
Photogrammetric control
Network control
Vertical control
None of the above
13. What does DTM stand for?
Digital triangular model
Direct terrain model
Digital terrain model
None of the above
14. Which of the following are poorly defined features?
Erosion Control Features
Geotech Features
Traffic Control Features
All the above
15. Surveying any rock face is easy and do not have any potential safety problems or issues.
True
False
16. Roadway buffer features are ___________ ?
curb
guiderail
driveways
All of the above
17. All property line and highway boundary field evidence for ROW Surveys shall be located directly from secondary project control using a TPS and radial surveying techniques. What does TPS stand for?
Total Survey Positioning System
Total Station Positioning System
Total Station Projectioning System
None of the above
18. Photogrammetric mapping methods cannot capture all of the information requested by design about the existing situation in a project area. Photo mapping only can capture every feature visible from a vantage point of about _________ straight up.
1100 ft.
1300 ft.
1500 ft.
1700 ft.
19. All survey equipment, including tripods, tribrachs, prisms, etc. shall be properly maintained and calibrated frequently according to manufacturers’ guidelines.
True
False
20. The order of importance of project control is

  1. Secondary Project Control Stations
  2. National Spatial Reference (NSRS) Stations
  3. Primary Project Control Stations
1-2-3
2-3-1
1-3-2
3-2-1